Home | About us | Contact Us 
 
Solid Oak Flooring, Oak Parquet & Engineered Oak Flooring London
Home | Book a Service | Contact Us | Basket [0] Call Us 0800 0434359
 
 
 
• Solid Oak Flooring
• Oak Parquet Flooring
• Engineered Oak Flooring

• Wood Floor Installation
• Parquet Floor Fitting
• Wood Floor Sanding
• Wood Floor Repairs

Wood Floor Installation: Preparing The Subloor
 
Read also...
 

Subfloors should be clean, flat and dry. Not doing so can lead to many problems with the flooring its self. These problems can be seen as loose flooring, squeaky joints, deflection and uneven surface.

The dry part of the Subfloor equations come from the moisture content in the air as discussed in the earlier point “check moisture”. The clean part means that all debris and general dirt from the work site must be clean and cleared away from the subfloor and also that anything that may interfere with the adhesive that is going to be used with the flooring is cleaned off. The floor must be flat to industry standards, subfloors that are not flat enough should be flattened before the flooring is installed. Many problems stem from using an inappropriate sub floor for the flooring used, it is crucial to get this right the first time!
 

           
About Us »   Questions & Answers »   Service Information »   Customer Comments »
  • 7 Days Service
  • Free Viewings & Estimates
  • Insurance Jobs
  • Residential & Commercial
     

    Warning: Invalid argument supplied for foreach() in /home/d/e/devlfs/public_html/templates/default/inc/footer.html.php on line 51
Copyright 2004 - 2009 • About usTerms & ConditionsContact UsSitemap